Jersey Strong
Jersey Strong.
Work Out World
Another look at the gym space.
Basement floor
The process of the concrete floor being removed.
WaterGuard
The WaterGuard installed and the concrete placed back.
WaterGuard
Another look at the WaterGuard system installed along the back of the wall.
Installation
Another look at our amazing crew working.
Prevention Measures
We at Quality 1st want to leave the space you have trusted to us, impeccable, so as construction began we hung these giant plastic sheets to protect the gym equipment & space.
First Step in WaterGuard Installation
The concrete being removed, making room for the WaterGuard drainage system.
Breaking Up the Concrete
Our equipment ready to remove the concrete.
The Floor is Ready for WaterGuard
The floor dug out to make room for the WaterGuard system.
Sump Pump Installed
TripleSafe Sump Pump.
Sump Pump Installation
TripleSafe Sump Pump.
Keeping Our Work Space Clean
More of our crew completing the work, cleanliness is a priority at Quality 1st.
Our Crew Starting the Construction Process
Our crew member starting the construction process.
Work Out World Meets WaterGuard
A view of the entire work space within this gym, you can see the WaterGuard to the right where the floor and wall meet.
Basement Floor mid Installation
The construction starting to begin.
Breaking Up the Concrete
The concrete floor being removed to have the WaterGuard installed.