Entrance Hazards
Here you can see the gaps in between each of the concrete slabs which were a tripping hazard. Additionally, rain water was collecting and creating puddles.
Sidewalk Hazards
In this photo you can see the concrete sinking, leaving a gap between the building and the sidewalk.
The Process
In this photo, our team in injecting PolyLevel into the concrete slabs to make it level. As you can see, the process is minimally disruptive and the concrete can be walked on just after 15 minutes of the installation.
The Final Product
The final product was a level, crack free and gap free sidewalk. After making sure that the slabs were level, our PolyLevel Team sealed all of the gaps and cracks to prevent future damage from occurring.