2 inches of Settlement
Concrete Repair Specialist, Andy G., measured roughly 2 inches of settlement in front of the entrance of this building.
Standing Water
Water would pool in front of the entrance way door after heavy rains.
Concrete Raising
Our solution has an easy insulation process! Our team drills very small, penny-size holes into each sinking slab. PolyLevel foam is injected underneath the slab. The foam expands, lifting the area and then hardens for permanent stabilization.
Successful Installation
Entrance is now completely leveled for a safe walk way in and out of this building.