Settlement
Jeff measured 2 inches of settlement.
Multiple Sinking Slabs
Multiple sections on both sides of this patio area were sinking and settling allowing water to easily pool after heavy rain.
Before
The goal was to raise the existing slabs back to level and permanently stabilize the slabs to prevent future settlement.
After
Our crew injected polyurethane foam, PolyLevel, underneath the slab to provide additional support to the weak soil.