Our team removes the soil from the area where the piers will be installed. Each pier section is screwed into the ground using special hydraulic equipment. Additional steel sections are then added to extend the pier to the appropriate depths and capacities, and a steel foundation bracket is connected to the Helical piers and attached to the foundations footing.