
Exterior Wall Cracks in Brick, NJ
Wall cracks

Bowing Wall in the Basement-Brick, NJ
The affected area where the interior wall is cracking

Wall Preperation by Quality 1st Basements
Walls being prepared to have Carbon armor placed

Wall Preparation -Brick, NJ
Side of the wall being sanded down for carbon armor

Corner Walls in Brick, NJ
French Drain and Carbon armor will be installed

Jack hammering Concrete in Brick, NJ
Crew member jack hammering concrete.

Before Patio Placement Side
All the old concrete was removed in preparation to replace.

Lifting Slabs with Quality 1st Basements
Contracting crew member lifting old slab out of the patio

Future Sidewalk Placement
There will be a new sidewalk connecting the driveway to the patio and front entrance

Before Patio Replacement with Quality 1st
Contracting division is breaking up the concrete

Drilling Into The Foundation Wall in Brick, NJ
Basement team member drilling holes into the foundation wall.

Water Spilling Out -Brick, NJ
All the water is stored inside the foundation walls so we drill to let it all out.

Carbon Armor Preparation by Quality 1st
Basement team member sanding the area were carbon armor will be placed.

Future Waterguard Placement
All the water previously trapped in the foundation wall being drained out.

Waterguard by Quality 1st Basements
Waterguard french drain system installed

Helical Piers Being Installed in Brick
Basement Team member carefully connecting the push pier to the machine.

Push Piers in Brick, NJ
Push pier installed on the foundation wall

Helical Piers Being Installed by Quality 1st Basements
Senior foreman, Victor Leon is installing the helical piers.

Quality 1st Concrete Pour
Our concrete division pouring concrete on barrows.

Concrete Being Smoothed Out in Brick, NJ
Senior Contracting Foreman, Ismael, is smoothing out the freshly poured concrete onto the patio surface.

Carbon Armor Preparation in Brick
Basement team member applying epoxy to the walls

Quality 1st Concrete in Brick, NJ
Our concrete truck pouring freshly mixed concrete

Carbon Armor by Brick, NJ
Complete installation of carbon armor wall reinforcement system

Waterguard Completely Installed by Quality 1st Basements
Waterguard and carbon armor installed in the basement.

Carbon Armor And Waterguard in Brick
Complete installation of carbon armor wall reinforcement system

Classic Sump Pump by Quality 1st
Sump pump, install complete.

Finished Concrete Patio Left Side
Concrete patio, set and dried.

Finished Concrete Patio Front Side
Concrete patio, finished and dried.

Finished Concrete Front Sidewalk by Quality 1st Basements
Concrete sidewalk finished and dried.