Before
Our system design specialist thoroughly examined the property to assess the level of settlement and offer the most reliable repair approach.
During Push Pier Install
Our crew removes soil around the foundation footing, then a specially engineered steel bracket is placed under the footing. Steel pier sections are hydraulically driven through the bracket to bedrock or a stable soil layer.
Push Piers Install
Once the stabilization and lift are completed, the soil is backfilled, and the entire system is concealed using a layer of cement.
Push Piers Fully In Place
The foundation has been successfully strengthened and lifted, this home is now fully reinforced against settlement issues.
SmartJack Install
A two-foot cube of soil is excavated at each SmartJack location. The hole is then filled with engineered fill to create a stable, load-bearing footing. The custom-engineered base is then positioned on top of this base to hold the SmartJack in place and properly distribute loads.
SmartJack System
High strength, galvanized steel tubing is cut to the appropriate height. The steel column and components are assembled and connected to the support beam, and the SmartJack system is tightened into place. The support beam and floor joists are immediately stabilized and the above floors and walls can be lifted back toward an even leveled state. Once this installation is completed, foundation settlement has been eradicated for good!