Click on a photo to enlarge.
SmartJack System installed in Manasquan, NJ to efficiently support the above floors in CrawlSpace.
This Manasquan foundation was compromised due to a large tree against the home. After the tree was removed, Quality 1st Basement Systems repaired the foundation cracks and bowing walls with CarbonArmor with the ArmorLock system which will stop any inward movement at the top of the wall as well, further keeping this home safe and stable!
A homeowner in Manasquan, New Jersey noticed their walls were bowing inwards and cracking. This is caused by the expansion of the soil and hydrostatic pressure. When soil gets saturated during periods of rainfall, the soil expands. When it expands in size, it puts a lot of pressure on the basement walls. The pressure becomes more than the wall can handle, and the wall begins to push inwards.
The homeowner contacted Quality 1st Basement Systems and our System Design Specialist, Jonathan Seminerio, provided an inspection of the home and helped them find a solution for this issue. He suggested they use a fiber material to permanently stabilize the wall. Our foreman installed the Carbon Armor System which has a fabric quality that makes it flexible to be installed tightly against the basement walls. This system will prevent the wall from bowing inwards and have minimal disruption to the foundation and landscaping.
A homeowner in Seaside Park, New Jersey noticed the floors in their home were sagging, their walls were cracking, and the main beams in the crawl space were unsound. These are all the symptoms of foundation settlement. When a crawl space is built, block columns could be spaced too far apart, which can lead to overloading and sagging between the columns. Weak soil can also cause the existing columns to sink or settle, which creates a gap between the top of the column and the bottom of the girder it was supporting. This can pose as a safety issue not only to the homeowner, but to the home as well.
The homeowner contacted Quality 1st Basement System and our System Design Specialist, Jack Huber, was able to help them come up with a plan to fix this issue. He suggested steel support system to help stabilize the foundation. Our foremen installed the SmartJack System, which do not replace the existing columns, but they help to bring strength and stability to the foundation. This process is done by assembling the steel beams into the soil. The support beams and floor joists are immediately stabilized and the above floors and walls will be lifted and stabilized. The support system is engineered to support large homes and load-bearing wall construction.
Our System Design Specialist, Mark Kleiner designed the Ultimate solution for the sagging floor joist in the basement of this Point Pleasant, NJ home. 20 PowerBraces and 6 SmartJacks were installed for additional support to the floor joist to prevent further sagging and movement.
First, Wilver and his crew install the PowerBraces against the floor joist beams then SmartJacks were installed for supplemental support.